I received most of my order on Fri the only semi critical parts that were backordered were the waste board and the drag chain. Not having the patience to wait I forged ahead and have the gantry rails and z assembly completed as well as the X controller. The waste board was shipped a couple days later and should be here on Wednesday, but no word on the drag chain
My question is should I start wiring now or wait? I don’t want to get to a point where I have to go back and there look to be some parts that may be harder to install later.
I will definitely be going through the calibration process before I do any carving.
I am an instructor at a nuclear power plant and long time machinist so following instructions and maintenance are second nature to me.