# Wasteboard hell

**URL:** <https://community.inventables.com/t/wasteboard-hell/17870>\
**Category:** Assembly\
**Created:** [December 28, 2015, 3:31am UTC](https://community.inventables.com/t/wasteboard-hell/17870 "2015-12-28T03:31:53Z")\
**Posts on this page:** 1\
**Showing post:** 52

<div class="post-metadata">

**Author:** ![ymilord](https://yyz1.discourse-cdn.com/flex009/user_avatar/community.inventables.com/ymilord/32/12691_2.png) [@ymilord](https://community.inventables.com/u/ymilord)\
**Post date:** [February 5, 2016, 5:47pm UTC](https://community.inventables.com/t/wasteboard-hell/17870/52 "2016-02-05T17:47:39Z")

</div>

> [@Clamp and Work Hold Down Options](https://community.inventables.com/t/clamp-and-work-hold-down-options/8608/17):
>
> I use these \> [http://www.amazon.com/INCRA-Build-It-Hold-Down-Clamp/dp/B000W07PEM](http://www.amazon.com/INCRA-Build-It-Hold-Down-Clamp/dp/B000W07PEM) (x10) and these [Kreg KMS7511 - Trak Clamp | Woodcraft](http://www.woodcraft.com/product/145831/kreg-trak-clamp.aspx) (x8) After I load the gcode and touch off X & Y. I jog the machine around the outer perimeter of the live view of the toolpath to make sure the hold downs are not in the way. If I am going to to be doing edge-to-edge work, I first make a four holes in the four corners of the material and place 4 metal dowel pins in the holes and line them up to the pre-made hole…

(Old picture)

 ![](https://canada1.discourse-cdn.com/flex009/uploads/inventables/original/3X/6/f/6f726fc5a6f7498ce3e1484d4d71392ce90800fa.jpg)

---

_[View the full topic](https://community.inventables.com/t/wasteboard-hell/17870)._
